HS2 slides final double composite viaduct 30/06/2025 08:45 | Featured Projects 1,300-tonne concrete and steel deck slid into position, marking the last of five built using HS2’s low-carbon construction method
HS2 completes second Wendover Dean Viaduct deck slide 14/05/2024 08:45 | Concrete Innovation ‘Double composite’ structure uses less carbon-intensive concrete and steel than a more traditional design